Services
- Bills for contractors (Bill of Quantity: Measurement sheets)
- Data with Management Reports for
- Cost control & better profitability
- Timely completion
- Value engineering
- Efficient and effective Project Management
- Pre-Bid services for contractors: BOQ, MS, Profit Analysis-Management Reports
- Pre-Bid services: Working out Rates while Quoting
- Profit Analysis: Working out profit / loss for each item, Post quote for contractors
- Optimization of structural design
- Labour contractors’ bills
- Bar bending schedule
A. Estimating Profits:
- After quoting for any work can you exactly calculate what would be your profit? Or does it remain vague i.e. some few % figure i.e. 7%, 8%, 10% etc. .
- Even if yes, how successful are you in achieving targeted profits? Does it fail basically due to lack of data?
B. Cost control:
- Do you analyse item wise profit for each and every item, after you have quoted, so that you can control, costs i.e. profit? OR if you have area based contract, do you put a cost ceiling on each item of work?
- Have you ever worked out list of all materials required for a job on a day zero?
- Do you audit & check wastage or theft of materials from site? Do you have accurate data for that?
- Do you know which materials you need to negotiate & buy and which your team need to buy based on costs?
- Have you ever scientifically calculated detailed overhead and finance costs or the detailed quantity of formwork?
A. Estimating Profits:
01. After quoting for any work can you exactly calculate what would be your profit? Or does it remain vague i.e. some few % figure i.e. 7%, 8%, 10% etc. .
02. Even if yes, how successful are you in achieving targeted profits? Does it fail basically due to lack of data?
B.Cost Control:
1. Do you analyse item wise profit for each and every item, after you have quoted, so that you can control, costs i.e. profit? OR if you have area based contract, do you put a cost ceiling on each item of work?
2. Have you ever worked out list of all materials required for a job on a day zero?
3. Do you audit & check wastage or theft of materials from site? Do you have accurate data for that?
4. Do you know which materials you need to negotiate & buy and which your team need to buy based on costs?
5. Have you ever scientifically calculated detailed overhead and finance costs or the detailed quantity of formwork?
C. Billing:
Billing
C. Billing
(i) Accuracy:
1. Are you able to check thoroughly all the measurements and bills prepared by your junior? Or do you sign it based on “tests checks” and ultimately on “Trust”?
2. Are you 100% sure that your billing engineer has not missed neither, any item nor any measurements?
Construction Management Reports
Data
- Around 5000 construction items with rates of different SORs like CPWD, Gujarat and other states in future
- You can also prepare / give your own SOR / items based on your local costs
Management Report
- Project Area Statement – Carpet Area efficiency
- Summary of Cost – Profit Analysis – Cost Break up
- Group Wise Cost Analysis
- Summary of Cost “Upto plinth – Superstructure”
- BOQ : Item Wise Profile Analysis
- Bill of Materials – Civil
- Bill of Material – Plumbing
- Bill of Labour – I (Worker Wise) and Labour Requirement Analysis
- Bill of Labour Costs–II (Market Rate Wise)
- Bill of Plant & Machinery and P&M Requirement Analysis
- Bill of Formwork
- Overhead Cost Analysis
- Financial Cost Analysis
- RCC Cost Analysis
- Stage Wise Costing
- Stage Wise Costing of Labour Work
- Excess – Saving Statement based on Tendered Quantity & every bill
- BOQ Comparison Year wise
- Floor Wise Analysis of Cost / Materials
- Sensitivity – Escalation Analysis
- Year wise / SOR wise Cost Reports
