Construction Management Reports

Data

  • Around 6000 construction items with rates of different SORs like CPWD, Gujarat and other states with prices of around 8000 materials.
  • You can also prepare / give your own SOR / items based on your local costs

Basic Deliverables*

  1. Bill of Quantity
  2. Measurement sheet
  3. Bar Bending Schedule
  4. As Built Drawings
  5. Management reports
* This shall depend on the package you buy

Management Reports

01. Project Area Statement – Carpet Area Efficiency

02. Summary of Cost – Profit Analysis – Cost Break up

03. Group Wise Cost Analysis

04 A. Summary of Cost “Up to plinth – Superstructure”

04 B. Summary of Cost “Up to plinth – Superstructure”

05. BOQ : Item Wise Profile Analysis

06. Bill of Material – Civil

07 A. Bill of Material – Plumbing – Pipes – Fittings – Fixtures

08. Bill of Material – Doors – Windows

09. Bill of Labour – I (Worker Wise) and Labour Requirement Analysis

10 A. Bill of Labour Costs–II (Market Rate Wise)

10 B. Group wise Labour Cost Analysis

11. Bill of Plant & Machinery and P&M Requirement Analysis

12. Bill of Formwork (Coming)

13. Overhead Cost Analysis

14. Financial Cost Analysis

15 A. RCC Cost Analysis- Overall – Element wise

15 B. RCC Cost Analysis (CONCRETE, STEEL, FORMWORK) Element Wise

15 C. Concrete Quantiy Element Wise

15 D. Steel Quantity Element Wise

15 E. Formwork Quantiy Element Wise

16 A. Stage Wise Costing - Materials

16 B. Stage Wise Costing - Labour Work

16 C. Stage Wise Costing - Labour Work Materials + Labour Work

17 A. GST

17 B. Summary of Bill

18. Excess – Saving Statement based on Tendered Quantity (at every bill)

19. Non Cad Items

20. Statement of Extra Items with Rate Analysis

21. Not Likely to be Executed

22. Sensitivity – Escalation Analysis

23. Steel requirement – Diameter wise (Coming)

24. Optimisation of Structural Design (Coming)

25. Funds Flow Forecasting (Coming)

26. Tender for Labour Work (Coming)

27. Cost Control Items (Coming)

28. Floor Wise Analysis of Cost / Materials (Coming)

29. BOQ Comparison: SOR wise / Year wise (Coming)

30. Natural Ventilation Efficiency (Coming)

31. Group wise / Item Wise Material – Labour Costs (Coming)

32. Audit / Reconciliation of Materials and Wastage @ every R/A (Coming)

33. Change in Rate with Change in Area / Height (Coming)

34. Per Flat / Per Toilet / Per Kitchen Cost (Coming)

35. RERA Reports (Coming)

36. Site Mobilization Expenses (Coming)

Sample Bills

01. Sample Abstract Sheet

02. Sample Measurement Sheet

03. Sample Bar Bending Schedule (BBS) – Footing & Column

04. Sample Bar Bending Schedule (BBS) – Beam & Slab

This Is How We Can Help You

  • No software which generates exact quantities in desired format from basic design drawings.
  • No software which gives detailed materials as well as labour requirements from basic design drawings.
  • The existing billing process of contractors is highly:
  • Tedious-cumbersome | Boring | Time consuming | Tasking | Inaccurate | Inefficient | Costly
  • Time consumed in billing increases interest / finance cost.
  • No data of Materials, Manpower, Plant & Machineries etc., available on zero day.
  • In absence of Data “Resource Planning” is either absent or difficult.
  • In absence of data, cost control is non-scientific and arbitrary.
  • Arbitrary cost control affects quality, speed of work and ultimately profit.
  • Estimate of exact overhead costs is absent which affects profit margins.
  • Accurate Real Time Sensitive (escalation) Analysis is almost impossible due to lack of data.
  • No Value Engineering is possible due to above constraints.
  • No control over leakage of materials and other resources at the site.
  • Very difficult for contractors and builders to update and prepare “As Built Drawings”.
  • Bar bending scheduling process is tedious and time taking.
  • With only one alternative of structural design it is difficult to judge whether it is really “the least cost design”.
  • Updation of Rate Analysis not always possible and not linked with ultimate cost and profit.
  • All these effects the “Profitability” in nut-shell.
  • Difficult to connect with Project Management software like Prime Vera, MS Project etc.